PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at Intake Facing West.jpg Motorized dampers.jpg Elevator 1,2,3 steel guide rails at the 2nd floor Facing West.jpg Exterior Framing at the 1st floor Facing North.jpg Installing copper piping at the 3rd floor Facing North-West.jpg Installing Exterior framing at the 1st Floor Facing North.jpg Installing weather strips at the curtain wall Facing South.jpg Installing weather strips throughout the Curtain Wall South Elevation.jpg Laying out block at Search Room 144 Facing South.jpg
Previous pageNext page Installing copper piping at the 3rd floor Facing North-West
Installing copper piping at the 3rd floor Facing North-West